FIRST EXPERIMENTS FOR TRISTRAM!
- Ektacom

- Nov 25, 2024
- 1 min read
Updated: Jan 9, 2025

First filed trials for TRISTRAM!
On April 25th and 26th, integration and testing sessions of the technological building blocks developed within the Tristram project took place in Saint-Philibert. The hardware (video compression and on-board analysis units) and software were integrated on the IMSolutions "Monodrone M3000" maritime drone. This integration session ended with an experimentation during which the following use cases were experimented:
- Coastal zone surveillance with robust real-time streaming via 4G network
- Sailing race start with robust real-time streaming via a 4G network and fast time-shifted retransmission of high-quality recorded videos ("Store&Forward" mode).
The results of these trials are conclusive. We would like to thank our partner IMSolutions for their warm welcome.
